Sec. 35.038. FACILITATING CERTAIN INTERCOMPANY LANDFILL GAS-TO-ELECTRICITY USE.
Utilities Code § 35.038
(a) This section only applies in a county with a population of more than 1.2 million in which a national wildlife refuge is wholly or partly located.
(b) Notwithstanding any other provision of this title, and for the purposes of reducing environmental emissions, putting to a beneficial purpose landfill gas as an electric generation fuel that would otherwise be flared, enabling the operation of electric generation to a greater degree, and enhancing the reliability and resilience of electric service in this state, a person who is not an electric utility and who owns and operates equipment or facilities to produce, generate, transmit, distribute, store, sell, or furnish electricity produced by the use of landfill methane gas may:
(1) use the equipment or facilities to provide electricity and electric service to the person and to the person's affiliates without being considered to be an electric utility, a public utility, a retail electric provider, a power marketer, or a person providing aggregation;
(2) interconnect the equipment or facilities in a timely manner and on reasonable and nondiscriminatory terms and conditions with any electric utility, municipally owned utility, or electric cooperative that has a retail service area for any portion of the equipment or facilities; and
(3) receive backup, supplemental, or other electric service for any of the person's or the person's affiliates' facilities that consume electricity from any electric utility, municipally owned utility, or electric cooperative that has a retail service area for any portion of the person's facilities or equipment that are interconnected regardless of whether those facilities are in the same retail service area as the location of the interconnection point.
(c) Backup, supplemental, or other electric service provided under this section through an interconnection for a person's electricity-consuming facilities that are connected to the person's interconnected equipment or facilities does not constitute a service area encroachment or other violation of law by the electric utility, municipally owned utility, or electric cooperative supplying the backup, supplemental, or other electric service.
Added by Acts 2021, 87th Leg., R.S., Ch. 426 (S.B. 3), Sec. 15, eff. June 8, 2021.
Amended by:
Acts 2023, 88th Leg., R.S., Ch. 644 (H.B. 4559), Sec. 270, eff. September 1, 2023.
Redesignated from Utilities Code, Section 35.037 by Acts 2023, 88th Leg., R.S., Ch. 768 (H.B. 4595), Sec. 24.001(61), eff. September 1, 2023.
Source details
- canonical id
tx-statute:ut:35.038- provision id
tx-statute:ut:[email protected]- version id
tx-statute:ut:[email protected]~7d1afa89c300ec37- record id
tx-statute:ut:[email protected]- document id
tx-statute-chapter:ut:35- record sha256
7ead2bf595867e816a1a46b45c604e466b50fbc57f2a78b711ffb6c632ba1456- anchor id
p-35-038-190810-194203- legalcore record url
https://legalcore.example.invalid/tx/statutes/ut/sections/35.038/190810.194203
Source locations are recorded for verification and are not links.
References in this section
-
Sec. 35.038. FACILITATING CERTAIN INTERCOMPANY LANDFILL GAS-TO-ELECTRICITY USE.
Reference details
- original href
https://statutes.capitol.texas.gov/Docs/UT/htm/UT.35.htm#35.038- target fragment
35.038- source context
paragraph- resolution reason
unique prepared provision #35.038 in tx-statute-chapter:ut:35- expected target id
tx-statute:ut:35.038- source document id
tx-statute-chapter:ut:35- source provision id
tx-statute:ut:[email protected]- target document id
tx-statute-chapter:ut:35- target provision id
tx-statute:ut:[email protected]- target version id
tx-statute:ut:[email protected]~7d1afa89c300ec37- candidate
tx-statute:ut:[email protected]- resolution status
resolved
Source locations are recorded for verification and are not links.
-
3
Target unavailable; not linked
Reference details
- original href
http://capitol.texas.gov/tlodocs/87R/billtext/html/SB00003F.HTM- source context
paragraph- resolution reason
target family not prepared (legislative_bill_text)- source document id
tx-statute-chapter:ut:35- source provision id
tx-statute:ut:[email protected]- resolution status
unavailable
Source locations are recorded for verification and are not links.
-
4559
Target unavailable; not linked
Reference details
- original href
http://capitol.texas.gov/tlodocs/88R/billtext/html/HB04559F.HTM- source context
paragraph- resolution reason
target family not prepared (legislative_bill_text)- source document id
tx-statute-chapter:ut:35- source provision id
tx-statute:ut:[email protected]- resolution status
unavailable
Source locations are recorded for verification and are not links.
-
35.037
Reference details
- original href
https://statutes.capitol.texas.gov/GetStatute.aspx?Code=UT&Value=35.037- target fragment
35.037- source context
paragraph- resolution reason
unique prepared provision tx-statute:ut:35.037- expected target id
tx-statute:ut:35.037- source document id
tx-statute-chapter:ut:35- source provision id
tx-statute:ut:[email protected]- target document id
tx-statute-chapter:ut:35- target provision id
tx-statute:ut:[email protected]- target version id
tx-statute:ut:[email protected]~12c8e16190c97242- candidate
tx-statute:ut:[email protected]- resolution status
resolved
Source locations are recorded for verification and are not links.
-
4595
Target unavailable; not linked
Reference details
- original href
http://capitol.texas.gov/tlodocs/88R/billtext/html/HB04595F.HTM- source context
paragraph- resolution reason
target family not prepared (legislative_bill_text)- source document id
tx-statute-chapter:ut:35- source provision id
tx-statute:ut:[email protected]- resolution status
unavailable
Source locations are recorded for verification and are not links.
Cited by
-
UT § 35.038
cites it as “Sec. 35.038. FACILITATING CERTAIN INTERCOMPANY LANDFILL GAS-TO-ELECTRICITY USE.”
Reference details
- original href
https://statutes.capitol.texas.gov/Docs/UT/htm/UT.35.htm#35.038- target fragment
35.038- source context
paragraph- resolution reason
unique prepared provision #35.038 in tx-statute-chapter:ut:35- expected target id
tx-statute:ut:35.038- source document id
tx-statute-chapter:ut:35- source provision id
tx-statute:ut:[email protected]- target document id
tx-statute-chapter:ut:35- target provision id
tx-statute:ut:[email protected]- target version id
tx-statute:ut:[email protected]~7d1afa89c300ec37- candidate
tx-statute:ut:[email protected]- resolution status
resolved
Source locations are recorded for verification and are not links.
Citations show recorded connections only, not legal effect or validity.